
Scheduling
Integrator
Project success rides on your team's ability to plan
ahead. So the more time you have to troubleshoot a
job, the better. With Scheduling Integrator, you have
the tools to start the ball rolling long before construction
begins.
Quick, realistic project schedules are an estimate
away when using the Integrator to connect Sage Timberline Office
Estimating to industry-standard scheduling software
such as Primavera or Microsoft Project for Windows.
Why build a schedule from scratch? Scheduling Integrator
gives you instant access to labor and equipment details,
material items, productivity factors, and estimator
notes. The task plan for building a schedule is practically
done for you. Simply open the project file in your
scheduling software and you're well on your way. A
great tool to jump-start and simplify the scheduling
process, and give your team more time to plan for
success.
Features
and efficiencies
- Generates
a schedule specifically geared for Primavera —
Project Planner® (P3®) and SureTrak®
Project Manager — Microsoft Project, or a
generic file for use in other scheduling software.
- Generates
tasks/activities by group phase, phase, item, assembly,
material class, subcontractor, location, job cost
phase, CAD reference or Work Breakdown Structure
(WBS) codes in the estimate
- Lets
you specify how work and duration units are measured
(by hours, days, weeks or months) based on scheduling
software options, and choose how days and weeks
are defined.
- Calculates
durations for entire task/activity.
- Tracks
labor/equipment resources, as well as subcontractors
and special material resources.
- Automatically
transfers estimator notes into scheduling software.
- Can
update a schedule with estimate additions or revisions.
- Runs
on a single workstation housing both Sage Timberline Office
Estimating and scheduling software; two workstations,
one hosting Estimating and the other hosting the
scheduling software; or a network.
|